- NEW DOUBLE DECK Roll Former
- Ag/Tuff Rib Panel 5 rib – on one level, ribs 9″ O.C., 36″ coverage panel, 13 forming stations
- PBR/R-Panel 4 rib -on the other level, ribs 12″ O.C., 36″ coverage panel, 15 forming stations
- Computer control – enter up to 3 batches at a time
- Hydraulic Shear and power supply
- Production Rate = about 35 fpm
- 8,500 lb. manual un-coiler included
- Up to 1 day operator training included – in our plant
- 1 year warranty on parts
- Tested and adjusted by our technicians
- Email for a shipping quote
- 220v 3 Phase power required – Single phase 220v converters available
- Loaded on your truck at our location in Sunnyside, WA.
$59,500.00